Month: March 2010

Floating! No leaks! We are thrilled! Thanks Billy and Brent for the help!

Posted by – March 31, 2010

photo 3.jpg

photo 2.jpg

photo.jpg

In the lift. Rolling to the water.

Posted by – March 31, 2010

photo 5.jpg

photo 4.jpg

photo 3.jpg

photo 2.jpg

photo.jpg

5200 and painting touch ups at the last second. Steven and Jenstylee.

Posted by – March 31, 2010

photo 5.jpg

photo 4.jpg

photo 3.jpg

photo 2.jpg

photo.jpg

Ready to launch. Waiting on the lift.

Posted by – March 31, 2010

photo.jpg

Almost there.

Posted by – March 31, 2010

photo 3.jpg

photo 2.jpg

photo.jpg

Last spots of paint are going on. Running gear is assembled. Launching shortly.

Ready to float!

Posted by – March 30, 2010

photo 5.jpg

photo 4.jpg

photo 3.jpg

photo 2.jpg

photo.jpg

Thru hulls installed. Rudder bolts locked. Line preventer for rudder installed. Lots of small stuff done. A few small things for tomorrow. Should be launching around 10.

Making backing plates. Thanks Brent.

Posted by – March 30, 2010

photo 3.jpg

photo 2.jpg

photo.jpg

Preparing to install 2 new through hulls. Launching tomorrow at 10am.

Posted by – March 30, 2010

photo 3.jpg

photo 2.jpg

photo.jpg

Rudder is hung. Launching Wed. Need some parts and some sleep.

Posted by – March 29, 2010

Dry fitting the rudder. It’s aligned but needs grinding in places where there’s too much epoxy.

Posted by – March 29, 2010

photo 5.jpg

photo 4.jpg

photo 3.jpg

photo 2.jpg

photo.jpg