Barely clearing the bridge

Posted by – March 6, 2009

photo.jpg

Heading out for a sea trial

Posted by – March 6, 2009

photo.jpg

Steven has his head in the toilet

Posted by – March 5, 2009

photo.jpg

Rules of the head!

Posted by – March 5, 2009

photo.jpg

Pee and poo tissues go in the trash can, please.

Painting the wood that the head will sit on.

Posted by – March 5, 2009

photo.jpg

Using Behr Premium Plus Exterior Semi-Gloss Ultra Pure White.

Testing the epoxy bond on the holding tank.

Posted by – March 5, 2009

photo.jpg

Hoping to install the new head and repaired holding tank this evening. 22 gallons should get us by for a while, unless we develop a peeing disorder and have to go every hour. Ewwwww!

Diesel – $2.29/gal

Posted by – March 5, 2009

photo.jpg

@ Ace putting together parts for a holding tank vent and pump out.

Posted by – March 5, 2009

photo.jpg

Trying on rainsuits

Posted by – March 5, 2009

photo.jpg

Sanding the port cover in preparation for fiberglass/epoxy.

Posted by – March 4, 2009

photo.jpg

Safety first! Nitrile gloves and heavy duty (though not asbestos rated, I think) respirator.